Issue 8.0 July 2002 vii
Operation and Maintenance
(TOP) 0
Overview 0
This section supports the operation and maintenance of the FT-2000 OC-48
Lightwave System product via task oriented practices (TOP) procedures. Use of
these procedures should be preceded by a general knowledge and understanding
of the software for the FT-2000 network. Refer to Volume I, Section 11, "Craft
Interface Terminal Usage." The TOP procedures are included in the following five
separate tabs:
■ Acceptance — Yellow tab
■ Circuit Order — Orange tab
■ Operation — Green tab
■ Trouble Clearing — Red tab
■ Detailed Level Procedures — Blue tab
Reason for Reissue 0
This document has been reissued for the following reasons:
■ To make modifications to the following procedures:
— TAP-113
— DLP-550
■ To add the following procedure:
— DLP-551
■ To correct inconsistencies and/or errors that occurred during the
processing of previous issues