9. Check the status of the SB server.
The SB server data on the standby server are compared completely with the master server
when the standby server reports the status "Listening".
You can check the status of the SIMATIC BATCH server using the symbol of the BATCH
start coordinator or using the shortcut menu command "BATCH status...”.
10.Check the corresponding WinCC status message in the Alarm Logging "CDV on BATCH
server "server name": CDV is ready for operation".
The message is only displayed when no PH is configured.
11.The update of the redundant SB system is now complete.
Note
Older versions cannot be upgraded to version SB V8.2 during operation.
Note the paragraph “Software update during operation (SUIR)” in the section”Notes”.
Procedure after a software update
1. Authorize all the PCS 7 software components used on all PCs in the Automation License
Manager.
2. Retrieve your PCS 7 project in the SIMATIC Manager.
3. In HW Config, configure new hardware components, for example, a new communications
processor.
4. Open all the current block libraries and update the blocks used in your PCS 7 project with
the command Options > Charts > Update block types.
5. If you use the "AS-based" mode, the "IUNIT_BLOCK" block from older SIMATIC BATCH
versions must be replaced in all CFC charts by the extended block, "UNIT_PLC". To do
this, drag it directly from the SIMATIC BATCH V8.2 library to the corresponding CFC charts
and interconnect it again if necessary.
6. Update the "UNIT_PLC" block in the CFC editor under Options > Block types... > New
version .... This transfers the block from the chart folder to the block folder, "Offline".
7. Compile and download the CFC charts to the automation system.
8. Compile all PCS 7 operator stations (server, clients). Then, open each individual PCS 7
OS station within your PCS 7 project on the ES and run the OS project editor. When the
WinCC Explorer is closed for each PCS 7 OS, download the current data to the appropriate
destination stations.
Product introduction and installation
3.10 Plant update
SIMATIC BATCH V8.2
92 Operating Manual, 02/2016, A5E35958174-AA