Operator’s Controls 9980 Self-Propelled Peanut Combine
58 08/05/16 MAN141.rev1
Bin Lift
The bin lift switch controls the lifting and
lowering of the peanut bin as follows:
• Push and hold the right of the switch to
raise the bin
• Push and hold the left to lower the bin.
NOTE! For this switch to work:
• The engine must be running to raise or
lower the peanut bin.
•
The indicator light for the road
transport disconnect switch must be
OFF (bottom photo).
Before lifting the peanut bin, check
overhead clearance to make sure that no
power lines, overhead limbs, or any other
obstructions exist. Contact with an
obstruction or power line could result in
death, electrocution, or serious personal
injury.
Road transport
disconnect