EasyManua.ls Logo

Fujitsu PRIMERGY RX300 S8

Fujitsu PRIMERGY RX300 S8
502 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
272 Upgrade and Maintenance Manual
RX300 S8
Processors
Figure 146: Closing socket release lever 1
Ê Close the socket release lever marked Open 1st (1) and latch it under the
load plate retention tab (2).
Ê If applicable, install the second processor accordingly.
11.2.3 Concluding steps
Ê "Installing processor heat sinks" on page 286
Ê "Reassembling" on page 63
Ê "Connecting the server to the power source" on page 69
Ê "Updating or recovering the system board BIOS and iRMC" on page 80
Ê "Switching on the server" on page 71
Ê "Enabling SVOM boot watchdog functionality" on page 89
Ê "Enabling BitLocker functionality" on page 95

Table of Contents

Other manuals for Fujitsu PRIMERGY RX300 S8

Related product manuals