EasyManua.ls Logo

Fujitsu PRIMERGY RX300 S8

Fujitsu PRIMERGY RX300 S8
502 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
284 Upgrade and Maintenance Manual
RX300 S8
Processors
11.4 Upgrading or replacing processors
V CAUTION!
Processors are extremely sensitive to electrostatic discharge and must
be handled with care. After a processor has been removed from its
protective sleeve or from its socket, place it upside down on a
nonconducting, antistatic surface. Never push a processor over a
surface.
11.4.1 Preliminary steps
Ê "Disabling BitLocker functionality" on page 73
Ê "Disabling SVOM boot watchdog functionality" on page 74
Ê "Locating the defective server" on page 51
Ê "Shutting down the server" on page 54
Ê "Disconnecting power cords" on page 54
Ê "Getting access to the component" on page 57
Ê "Removing processor heat sinks" on page 291
11.4.2 Upgrading or replacing a processor
I This description applies to the following procedures:
Installing the second processor in a single-processor configuration
Transfering a processor after replacing the system board (see section
"Replacing the system board" on page 431)
In case of installing a second processor remove the protective cover as
described in section "Opening the load plate" on page 264
Field Replaceable Unit
(FRU)
Hardware: 15 minutes
Software: 5 minutes
Tool: Phillips PH2 / (+) No. 2 screw driver

Table of Contents

Other manuals for Fujitsu PRIMERGY RX300 S8

Related product manuals