EasyManuals Logo

Fujitsu PRIMERGY RX300 S8 Upgrade And Maintenance Manual

Fujitsu PRIMERGY RX300 S8
502 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #273 background imageLoading...
Page #273 background image
RX300 S8
Upgrade and Maintenance Manual 273
Processors
11.3 Removing processors
11.3.1 Preliminary steps
Ê "Disabling BitLocker functionality" on page 73
Ê "Disabling SVOM boot watchdog functionality" on page 74
Ê "Shutting down the server" on page 54
Ê "Disconnecting power cords" on page 54
Ê "Getting access to the component" on page 57
Ê "Removing processor heat sinks" on page 291
11.3.2 Removing a processor
I This description applies to the following procedures:
– Removing CPU 2 from a dual-processor configuration
– Removing CPUs from a defective system board (see section
"Swapping processors" on page 438)
Ê Remove the desired processor heat sink as described in section "Removing
processor heat sinks" on page 291.
Upgrade and Repair Unit
(URU)
Hardware: 15 minutes
Software: 5 minutes
Tool: Phillips PH2 / (+) No. 2 screw driver

Table of Contents

Other manuals for Fujitsu PRIMERGY RX300 S8

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu PRIMERGY RX300 S8 and is the answer not in the manual?

Fujitsu PRIMERGY RX300 S8 Specifications

General IconGeneral
MemoryUp to 768 GB DDR3
Form Factor2U rack server
Remote ManagementiRMC S4 (Integrated Remote Management Controller)
ChipsetIntel C602
ProcessorIntel Xeon E5-2600 v2 product family
StorageUp to 16 x 2.5" or 8 x 3.5" drives
RAIDRAID 0, 1, 5, 6, 10, 50, 60
Network4 x Gigabit Ethernet ports
Expansion Slots6 x PCIe 3.0 slots
Operating System SupportWindows Server, Red Hat, SUSE, VMware
Memory TypeDDR3 RDIMM/LRDIMM
Power SupplyHot-plug redundant power supply units

Related product manuals