EasyManua.ls Logo

Fujitsu PRIMERGY RX300 S8

Fujitsu PRIMERGY RX300 S8
502 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
66 Upgrade and Maintenance Manual
RX300 S8
Basic hardware procedures
Additionally, a lifter is required in the following cases:
The server weighs more than 50 kg.
The server weighs more than 21 kg and is to be installed above the
height of 25 U.
When using a lifter, this installation procedure needs to be carried out by
maintenance personnel.
I Refer to the rack cabinet manuals for more detailed information on other
support systems.
Ê If required, install the rack mounting bracket and rack system into the rack
as described in the Rack Mounting Kit - RMK-F1/F2 DROP-IN Quick
Release Lever (QRL)" Mounting Instructions.
I The printed poster is contained in the rack mounting kit.
For configurations below 55 kg:
At least three people are needed to lift the server
into the rack cabinet.
For configurations above 55 kg:
At least four people are needed to lift the server
into the rack cabinet.

Table of Contents

Other manuals for Fujitsu PRIMERGY RX300 S8

Related product manuals