NTP-003: Operation 365-575-102
Page2of6 Issue8.0,July2002
3. The secondary node carries traffic only if the primary node is unable to carry
traffic.
From the operation instructions, identify and
record the cross-connections to be made at the
secondary node.
—
4. If required, connect the craft interface terminal
(CIT) to the local FT-2000 network element and
condition it.
DLP-501
5. Establish a login to the secondary node. (To
remotely establish a login, refer to DLP-524
.)
—
6.
NOTE:
The normal cross-connection at the secondary node is a 2-way
cross-connection, however, a 1-way cross-connection is used for
half-duplex transmission.
At the CIT, select
CONFIGURATION-Retrieve-Crossconnect
ion-STS3 (or STS1) and execute to obtain
an STS3 (or STS1) Cross-Connection Map
Report. Section 11 shows examples of reports.
—
7. Compare the report with the operation
instructions and record any cross-connections to
be added and/or deleted at the secondary node.
—
8.
!
CAUTION:
The cross-connections to be deleted MUST NOT be carrying traffic;
otherwise, service interruptions will occur.
Delete any unnecessary cross-connections
associated with the tributary(ies) and/or the
slot(s) to be cross-connected. Use the
CONFIGURATION-Delete-Crossconnectio
n-STS3 (or STS1) command to delete a
cross-connection.
DLP-536
DOITEMSBELOWINORDERLISTED........ FORDETAILS,GOTO

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lucent Technologies FT-2000 OC-48 and is the answer not in the manual?

Lucent Technologies FT-2000 OC-48 Specifications

General IconGeneral
BrandLucent Technologies
ModelFT-2000 OC-48
CategoryNetwork Hardware
LanguageEnglish