NTP-003: Operation 365-575-102
Page6of6 Issue8.0,July2002
Operation: NTP-003---+---DLP-501
|---DLP-524
|---DLP-53
|---DLP-542
|---DLP-541
23. Verify that the cross-connections in the report
match those in the operation instructions.
—
24.
NOTE:
This step is optional. If the cross-connection just deleted was to a slot
containing an OC-3 circuit pack, you may want to provision the DCC
assignment to remove DCC connectivity with the network element at the
other end of the OC-3 line.
You may delete a DCC assignment on an
OC-3 line.
DLP-542
25.
NOTE:
This step is optional and only applies if there are no low-speed
connections to an external network(s).
Test DRI cross-connections for path integ-
rity.
DLP-541
26. Discontinue the login at the primary node. (To
discontinue a remote login, refer to DLP-524.)
—
27. The necessary cross-connections have been
made in the primary and secondary nodes, and
they are ready to support dual ring interworking
(DRI) operation with the second SONET ring
network.
—
28. Refer to DLP-536 to make any other necessary
cross-connections at other nodes in the FT-2000
2-fiber ring network.
—