NTP-009: Operation 365-575-102
Page 8 of 16 Issue 8.0, July 2002
Operation: NTP-009---+---DLP-501
|---TAP-102
Remove the Forced Switch - MERGE the Two Rings
32. From the CIT access each of the four nodes where
fibers were changed and select the
FAULT-Switch-Line:1W/1E:Reset command to
reset each node. Figure 7 is an example of what the
ring should look like after the Protection Switch has
been removed.
NOTE:
Switching hits will occur on service traffic carried
through the fibers to be reset.
33. This completes the "Merge Two OC-48 Rings"
procedure. Additional new services can now be added
between all nodes on this new ring.