EasyManua.ls Logo

Lucent Technologies FT-2000 OC-48 - Page 1126

Lucent Technologies FT-2000 OC-48
1578 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NTP-010: Operation 365-575-102
Page4of4 Issue8.0,July2002
Operation: NTP-010---+---TAP-102
+---DLP-501
16. Verify that there are no active alarms or status
conditions by selecting the
FAULT-Retrieve-Alarms (and Status):All or by
pressing function key F9. Review the Active
Alarms and Status Report and clear any
conditions before continuing with this procedure.
TAP-102
17. Are there additional nodes to be upgraded?
If NO, then go to Step 19.
If YES, then continue.
As necessary, assign personnel to the next two
nodes to be upgraded (e.g., B and C).
18. Repeat steps 7 through 17, replacing site A with
B and B with C, etc,. Repeat these steps until all
pairs of nodes around the ring have been
completed.
19. Now, STS-1 granular add and drop
cross-connections can be established to nodes
in the ring where STS-1 granular optical packs
are installed. This completes the procedure.
DOITEMSBELOWINORDERLISTED....... FORDETAILS,GOTO

Table of Contents