365-575-102 DetailedLevelProcedure:
Issue 8.0, July 2002 Page 1 of 2
DLP-507
Turnup Test — Point-to-Point System
Overview: This procedure is used to verify end-to-end transmission for an FT-2000
point-to-point network. If you are unable to complete the procedure or the test fails,
contact the group who did the installation.
1. Is this test part of the initial acceptance or part of the Protection Access
Upgrade?
If initial acceptance of network element, then continue with Step 2.
If an upgrade to add Protection Access, then continue with Step 4.
2. At the local CIT, select FAULT-Test-Auto Turnup for All lines in the System
mode.
3.
NOTE:
"g" is for good or successful test. "-" is for not tested. "F" is for failed or
unsuccessful test. Test takes 1 minute.
Did the report indicate "g" or "-" for each entry? See Figure 1 for an
example.
If YES, then STOP! YOU HAVE COMPLETED THIS PROCEDURE.
If NO, then refer the problem (failed system test) to the group that
installed the equipment.
Figure 1 – Example of Test Auto Turnup Report - System Test (Service Line and
Protection Line)
Lucent Technologies FT-2000 96-11-17 08:30:45 EST
M Test-Auto:All: COMPLD
/* Test-Auto Turnup Report - System Test
=============================================================
Line 1: Transmit Receive
Direction Direction
gg
-------------------------------------------------------------
Line P: Transmit Receive
Direction Direction
gg
=============================================================
*/
;