Test Parallel Telemetry
Overview: This procedure is used to test all the parallel telemetry points for proper
operation. This procedure is performed during the acceptance of the FT-2000
network elements when they are out of service and is performed only during this time.
For additional information, refer to the "Parallel Telemetry Interface" part in Section 6,
"Operations Interfaces."
1. Contact the remote operations center and request their assistance in
monitoring the parallel telemetry points during this test.
2. At the remote operations center, disable the alarm threshold level for the
telemetry points being tested.
3. At the local CIT, select FAULT-Test-Telemetry-Parallel and Mode:
All with Repeat: 1.
Response: All parallel telemetry points are simultaneously turned on for
20 seconds, then off for 20 seconds before reverting to normal opera-
tion.
4. Does the test pass as monitored from the remote operations center.
If YES, then STOP. YOU HAVE COMPLETED THIS PROCEDURE.
If NO, then refer to the Installation Manual to correct the problem or con-
tact the group who did the installation.