365-575-102 Acceptance: NTP-002
Issue 8.0, July 2002 Page 3 of 4
Acceptance: NTP-002---+---DLP-500---+---DLP-511
| |---DLP-512
| |---DLP-510-------DLP-512
|---DLP-501-------Operation: NTP-002
|---DLP-502
|---DLP-503---+---DLP-518-------DLP-511
| |---DLP-500---+---DLP-511
| |---DLP-512
|---DLP-505 |---DLP-510------DLP-512
|---DLP-513
|---Acceptance: NTP-003
9. Obtain an Active Alarm and Status Report (use
Retrieve-Alarm) and verify that it shows only the
two conditions below (no other conditions should
be listed):
line-1 site provisioning conflict
line-p site provisioning conflict
10. Perform automatic low-speed cabling test ( to
cross-connection) for all low-speed ports on
each line.
DLP-503
11. If required, perform provisioning at this time. DLP-505
12. If so equipped, test the fan assembly for proper
operation.
DLP-513
13. The FT-2000 end terminal has passed the
acceptance tests. After all FT-2000 network
elements have been tested individually, the
network (system) is ready for the FT-2000
point-to-point network acceptance test.
Acceptance: NTP-003
DO ITEMS BELOW IN ORDER LISTED . . . . . . . FOR DETAILS, GOTO

Table of Contents