NTP-002: Acceptance 365-575-102
Page2of4 Issue8.0,July2002
NOTE:
Ignore the LEDs at the user panel during this test.
Inspect the FT-2000 end terminal for obvious
damage.
—
2. At the DSX-3 cross-connect panel or equivalent,
disconnect all DS3 connections to the FT-2000
end terminal.
—
3. Loop back all high-speed OC-48 lines. DLP-500
4. If required, connect the Craft Interface Terminal
(CIT) to the local FT-2000 network element and
condition it.
DLP-501
5. At the CIT, select SECURITY-Set-Network
Element and Site 0 with a Yes, then execute by
using F9.
—
6. At the CIT, select CONFIGURATION-Update
and execute.
—
7. Obtain an Active Alarm and Status Report (use
Retrieve-Alarm) and verify that it shows only the
two conditions below (no other conditions should
be listed):
line-1 site provisioning conflict
line-p site provisioning conflict
—
8. Perform local automatic turnup test for all lines. DLP-502
DO ITEMS BELOW IN ORDER LISTED . . . . . . . FOR DETAILS, GOTO