365-575-102 Acceptance: NTP-009
Issue 8.0, July 2002 Page 9 of 12
Figure 1 – Testing Local FT-2000 Ring (Three Nodes)
59. This completes testing path integrity (Figure 5). —
60. This completes testing path integrity (Figure 5) in the
local FT-2000 ring. If one of the external networks is
non-Lucent (another vendor), refer to local
maintenance procedures to test path integrity in that
network. If an external network is a DDM-2000 ring,
refer to the appropriate manual as follows:
—
63-206-202 for DDM-2000 OC3 for Releases 2 through 7.2
63-206-280 for DDM-2000 OC3 for Release 8 and Higher
63-206-207 for DDM-2000 OC12/OC12 Regenerator for Releases 1
through 3.1
63-206-290 for DDM-2000 OC12 for Release 5 and Higher
DO ITEMS BELOW IN ORDER LISTED . . . . . . . FOR DETAILS, GO TO
Local
FT-2000
Ring
Test Set
S
P
Note: One DRI cross-connection to the outside. Both DRI cross-connections and local
source/destination cross-connections terminate directly to test sets.
Test Set
Test Set