Strasbaugh Universal Vacuum System
Page 20 Version 1.2—March 2004
OPERATION
BEFORE PLUGGING IN
Before operating this equipment, read the connection and adjustment directions in this
instruction. The following is a checklist of items to address before starting this equipment.
• Remove all packing material.
• Inspect for damage.
• Place the Universal Vacuum where it will be needed, making sure it is level and stable.
• Make sure the power cabinet is shut and locked.
• Make sure the drain cock valve on the bottom of the drain tank is closed.
• Connect the proper house drain to the Industrial Waste connection
• For safety, turn the facilities compressed air connection valve to the OFF position.
• Connect pressurized air to the Clean Dry Air connection. Turn the valve to the ON
position.
• Connect vacuum lines to exterior equipment.
START UP
1. Connect electrical power to the UVS.
2. Turn the power disconnect switch to the ON position.
3. Turn the facilities compressed air connection valve to the ON position.
4. Press the ON button.
5. Verify that the pilot pressure regulator is set to 80 psi. Adjust as necessary.
6. Verify that the purge pressure regulator is set between 15 and 20 psi. Adjust as
needed.
SHUT DOWN
Use the EMO switch or turn off the power disconnect switch. Both are on the front of the
machine. For safety , turn the compressed air facilities connection valve to the OFF
position.