Strasbaugh nTellect (Model 7AF) Wafer Grinder
13 - 6 Version 1.2 - June 2004
INCOMING CLEAN DRY AIR
Solenoid
No.
Component Name
Location/
Drawing No.
Setting Goals
None
Incoming Clean Dry Air
Supply
Regulator: Supply
regulator; connection
to machine located
on Lower Rear
Utility Panel.
Drawing: 224004,
Sheet 4 of 6
Pressure: 100 PSI
Procedure:
1. Connection to supply:
Incoming compressed air is supplied through a 1/2-in. tube connection located
on the Lower Rear Utility Panel.
A source of clean, dry, compressed air at 100 PSI should be connected to the
1/2-in. tube.
2. Set the supply regulator at 100 PSI:
• Rotate the knob on the regulator until the pressure gauge reads 100 PSI.
Note: All lines on the machine are set at 100 PSI unless adjusted lower by
valves.