EasyManua.ls Logo

Studer D950 - Page 572

Studer D950
648 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D950/Vista Digital Mixing System
7-6 ConfigTool SW V3.3 Date printed: 05.08.03
Temp Files Path, and
Config Path,
for which the appropriate paths must be entered manually; they must be
followed by a backslash (\) sign.
After making the appropriate entries please click “OK” to finish the prepa-
rations and to store the edited D950CfgTool.ini” file automatically. To
learn more about the use of the .ini file, please refer to chapter 7.5, Main-
tenance.
Test the Installation: Now that you have installed all files and set the basic options, you can
proceed to test the whole installation, by generating an empty configura-
tion. This empty configuration is loaded per default after starting the ap-
plication.
Select the menu item “Generate” and then “All”. This will start the process
of generating the DSP and control software that is needed to run a new
Session Configuration on your console. Various messages will be dis-
played, and after a while, a message similar to the following one should
appear:
After the message “Build All finished successfully !!” appears, click on
“OK” to finish the successful installation and test procedure.

Table of Contents

Related product manuals