Chapter 5 – Product Flow Control
193
Firmware Version 3/4.31.37
short the first component in the recipe; the first component will be shorted by the Line Flush Volume. If this
parameter is disabled, MultiLoad will look to the third decision parameter.
The third decision parameter is Take Line Flush From Last. This parameter must be enabled if the two previous
parameters are disabled. MultiLoad will subtract the Line Flush Volume from the last component in the recipe.
The preset quantity will be satisfied by the Line Flush Component during the Line Flush stage.
Example
The following table shows how a 1000 gallon load is affected by each of the decision parameters. The product is
a 60/40 blend. Component #1 is 60% of the total, and component #2 is 40% of the total. The Line Flush
Component is component #1. The Line Flush Volume is 100 gallons.
Component #
Desired
Ratio
Quantity Delivered
Flush Option
Example 1
1
600
500
Take Flush from Matching Component
2
400
400
Flush
100
Line Flush Component is component #1
Preset Total
1000
1000
Example 2
1
600
500
Take Flush From First Component
2
400
400
Flush
100
Line Flush Component is component #1
Preset Total
1000
1000
Example 3
1
600
600
Take Flush From Last Component
2
400
300
Flush
100
Line Flush Component is component #1
Preset Total
1000
1000
In Example 1, using Take Flush From Matching Component results in a 60/40 blend. The first component is
shorted by 100 gallons, but it is made up at the end of the load, since the first component is also the flush
component.
Example 2 produces identical results. The MultiLoad will short the first component in the product recipe, which
happens to be the designated flush component.
In Example 3, when the Take Flush From Last Component is executed, the resulting product ratio is 70/30. The
last component (component #2) is shorted by 100 gallons and the preset quantity is satisfied by flush component,
which is component #1. The desired 60/40 result would have been achieved in this case if component #2 had
been designated as the Line Flush Component.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Toptech Systems MultiLoad II and is the answer not in the manual?

Toptech Systems MultiLoad II Specifications

General IconGeneral
BrandToptech Systems
ModelMultiLoad II
CategoryControl Unit
LanguageEnglish

Related product manuals