14-102
Using the Web Browser Interface for Basic Configuration Tasks
Configuring Demand Routing for a Primary or Backup Connection
Figure 14-75. Add Connect Sequences
To configure a connect sequence, complete the following steps:
1. On the Add Connect Sequences screen, in the Sequence Number field,
enter a unique number to identify this connect sequence.
2. Click the Add button.
The Sequence Configuration screen is displayed. The Sequence Number
field should display the number that you entered for this connection
sequence.
Figure 14-76. Demand Interface Sequence Configuration
3. In the Demand Interface field, use the pull-down menu to select the
appropriate demand interface for this connect sequence.