EasyManua.ls Logo

HP ProCurve 7000dl Series

HP ProCurve 7000dl Series
910 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14-95
Using the Web Browser Interface for Basic Configuration Tasks
Configuring Demand Routing for a Primary or Backup Connection
Configuring the Demand Interface
After you configure the ISDN group, you should configure the demand inter-
face. The demand interface handles the Data Link Layer protocol for the
demand-routing connection in addition to other functions for the ISDN call.
The actual Data Link Layer protocol used for demand-routing connections is
PPP.
To add a new demand interface, complete the following steps:
1. Click Demand Routing in the Router/Bridge section of the navigation bar.
Figure 14-69. Add/Delete/Modify Demand Interface
2. On the Add/Delete/Modify Demand Interface screen, in the Demand
Number field, enter a number for the interface in the range from 1 to 1,024.
3. Click the Add New Interface button. The “Demand Configuration” screen
is displayed.

Table of Contents

Related product manuals