Operations and Maintenance Manual Mechanical Maintenance Procedures
Version 1.2 - June 2004 11 - 27
Recheck Both Leveling Adjustments
5. Recheck the side to side adjustment by repeating the steps above in this
section.
If needed, repeat the side to side adjustment until the goal is met.
6. Recheck the front to rear adjustment by repeating the steps above in this
section.
If needed, repeat the front to rear adjustment until the front to rear leveling
goal is met.
7. When both goals are met, go on to the Mount the Fringe Plates to the Lower
Spindle Assemblies and Adjust procedure, immediately below.