EasyManua.ls Logo

Strasbaugh nTellect 7AF - Page 363

Default Icon
2493 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operations and Maintenance Manual Mechanical Maintenance Procedures
Version 1.2 - June 2004 11 - 103
FINE ADJUSTMENT - LEVELING AGAINST THE ROBOT
Cassette Platform (Turret) 1
Before You Begin
1. Confirm that air and vacuum are ON.
2. Confirm that machine is powered up.
Procedure
1. Place a cassette on the platform.
Use a cassette that will accommodate the largest wafer you plan to
process.
2. Rotate the turret back to its robot position (facing the robot):
Touch to Select Explanation/Screen Display
Cassette 1
icon At the Output Control/Input Status menu, touch
the "Cassette 1" (Send1 Cassette) icon at the
Output Control/Input Status Menu to rotate its
platform.

Table of Contents

Related product manuals