Operations and Maintenance Manual Installation
Version 1.2 - June 2004 2 - 5
PREPARATION FOR INSTALLATION
Tools Required
• 9/16-in. open-end wrench
Procedure
1. Carefully remove the protective plastic covers.
2. Remove the padded block from beneath the monitor.
3. The machine is attached to the pallet with lag screws fitted through holes in the
cabinet base frame (grinding area) and with L brackets (handling area). Access
and remove the lag screws, shipping bracket, and L brackets:
a. Remove doors 14, 17, and 19.
Note: Doors and their associated door frames are labeled on the
machine.
b. Remove the four grinding area lag screws, located near the mounting feet
of the grinding section, to free the section from the pallet.
Be sure the screws removed are lag screws embedded in the pallet and not
assembly mounting bolts or the leveling feet.
c. Open doors 8 and 9.
d. Remove the L brackets from the pallet to free the handling section.
e. Replace doors 14, 17, and 19.
f. Close doors 8 and 9.