EasyManua.ls Logo

Yamaha F400A 2022 - Page 220

Yamaha F400A 2022
592 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-9
Electrical component and wire harness routing
1. Lighting coil (stator assembly)
2. Thermo sensor (STBD)
3. Electrical management box
4. Intake air pressure/temperature sensor
5. Bonder (black leads with white tape)
6. Bonder (orange leads)
7. Bonder (black leads)
8. PTT ground lead
9. PTT lead
10. Wire harness (to the main wire harness)
11. Wire harness (to the PTT switch lead)
12. Rectifier/regulator lead
13. Lighting coil lead
14. Cooling water hose
A. Fit the protrusion on the wire harness
holder into the hole in the wire harness
guide, and then install the lead terminals
to the electrical management box.
B. Route the wire harness under the
electrical management box.
C. Fit the protrusion on the wire harness
holder into the hole in the wire harness
guide.
D. Position the slack in the wire harness
between these holders.
E. Position the coupler and lead of the
rectifier/regulator inside of the
corrugated tube.
F. Fasten the wire harness at the white
tape using the holder.
G. Fit the protrusion on the wire harness
holder into the hole in the wire harness
guide.
H. Install the lead terminal into the groove
of the electrical management box, and
then, fit the internal groove of the lead
cover into the stud bolt head on the
electrical management. box.
I. Route the TPS lead under the wire
harness (to the main wire harness) and
wire harness (to the PTT switch lead).
J. Route the leads in the order shown.
Position the slack in the lighting coil
leads between the rectifier/regulator and
the holder.
K. Route the hose and leads in the order
shown.

Table of Contents

Related product manuals