6 The RCT will display a Commit screen (Figure G.11) before sending configuration messages to
any instrument. This screen gives you a last chance to mak
e corrections before committing the
specified changes. Select
BACK to go back to the previous screen(s) to make any corrections.
Selecting
CANCEL will exit the RCT without configuring any of the selected instruments.
Figure G.11 Commit Screen
Select the PERFORM CONNECTION TESTS checkbox to perform a connection test for each config-
ured setup. Results of these tests will be presen
ted on the Completion screen and a VIEW TEST
LOG
button will be provided if any instrument failed a connection test.
Note: In some networks, the RCT will run successfully and configur
e the HFA, but the connection
test will still fail, indicating that the HFA cannot currently export files to the shared folder. If a
connection test fails, see “Troubleshooting,” on page G-43 for more information.
When you select
NEXT, all selected instruments will be sent the specified configuration.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zeiss Humphrey II-i series and is the answer not in the manual?

Zeiss Humphrey II-i series Specifications

General IconGeneral
BrandZeiss
ModelHumphrey II-i series
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals