EasyManuals Logo

Zeiss Humphrey II-i series User Manual

Zeiss Humphrey II-i series
580 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #478 background imageLoading...
Page #478 background image
EasyConnect RCT 1.0
Humphrey Field Analyzer II-
i
series User Manual 2660021145640 A
G-38
The RCT displays a message alerting you there will be a delay before proceeding (Figure G.46).
Figure G.46 Please Wait Message
3 A Ready to Test screen will be displayed (Figure G.47 and Figure G.48). Select NEXT to begin
testing your configured instrument
s, one at a time. Figure G.49 shows a connection test in
progress for the first instrument configured. When an instrumen
t has finished testing, the entry
in the Test column changes to either “PASSED” or “FAILED.” Keep selecting
NEXT until all
instruments have completed testing.
Figure G.47 Configuration Complete in Test Mode – Ready to Test

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zeiss Humphrey II-i series and is the answer not in the manual?

Zeiss Humphrey II-i series Specifications

General IconGeneral
BrandZeiss
ModelHumphrey II-i series
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals