7360 ISAM FX-8 shelf cabling
264
ANSI Hardware Installation Manual
3HH-12893-AAAA-TCZZA Issue: 09
DRAFT
Figure 137 External frame ground point rear view
4 Perform power and ground tests as per local practices.
5 STOP. This procedure is complete.
14.5 Power cabling
This section describes the 7360 ISAM FX-8 general information, power distribution
unit location, and the external power cabling procedure to connect the power cables.
22676
Frame ground point
Frame ground point
No. 6 AWG lug and 2 12-24 screws
(provided with the rack)
Frame ground point
(may be located on
the opposite side
on some racks)
Rack frame ground locations rear view