ANSI Hardware Installation Manual Installing a 7360 ISAM FX-8 shelf
Issue: 09 3HH-12893-AAAA-TCZZA 245
DRAFT
Figure 128 Horizontal mounting locations for 7360 ISAM FX-8 in a 23 in. rack
5 Attach the left and right shelf mounting plates to the 7360 ISAM FX-8 rack using 12-24 × 1/2
in. (12.7 mm) screws.
6 Orient the 7360 ISAM FX-8 shelf horizontally with the fan unit located on the right side and
align the shelf unit with the left and right mounting plate holes.
TOD/IHZ
FAN
NTA
NTIO NTB 01 02 03 04 05 06 07 08
7360 ISAM FX-8
Energy Hazard
Critical
Alarms
ACO
BAT A
Remote Craft
BITS
External Alarms
Major
Minor
BAT B
7360 ISAM FX-8
B-40A
A-40A
NTA GND NTB
43
42
41
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
22735