Installing a 7360 ISAM FX-16 shelf
80
ANSI Hardware Installation Manual
3HH-12893-AAAA-TCZZA Issue: 09
DRAFT
•
2 AWG .25 mm dual-hole lug
• left and right mounting brackets including:
• 12 × 24 1/2 in. (12.7 mm) hex screws (x 5 each side)
• heat and fiber management baffle kit including:
• pre-assembled front and rear skirt, intumescent panel, and top baffle
• M3 × 8 mm screws
• M3 × 14 mm screws
• required washers
• fiber management bracket pre-assembly
• 12 × 24 1/2 in. (12.7 mm) screws
• drip tray
5.2.3 Recommended tools
The following tools are recommended:
• torque wrench
• protective gloves
• hex driver
5.2.4 Prerequisites
Before starting the procedure to mount the 7360 ISAM FX-16 shelf, a drip tray must
first be installed, see Procedure 11 “To install a drip tray below a 7360 ISAM FX-16
shelf”.