Installing a 7360 ISAM FX-4 shelf
316
ANSI Hardware Installation Manual
3HH-12893-AAAA-TCZZA Issue: 09
DRAFT
17.2.2 Parts list
The following parts are required:
• 7360 ISAM FX-4 shelf (NFXS-F)
• grounded 19 in. EIA standard rack or 19 in. seismic standard rack that can
accommodate the 7360 ISAM FX-4 shelf
• horizontal shelf mount kit containing:
• 12-24 × 1/2 in. (12.7 mm) screws
• mounting brackets not required
• vertical shelf mount kit containing:
• pre-assembled top cross bracket, rear skirt and front skirt
• pre-assembled shelf horizontal mount bracket and air intake baffle/drip tray
• intumescent panel
• top baffle
• 12-24 × 1/2 in. (12.7 mm) screws
• M3 × 5/16 in. (8 mm) screws
• M3 × 9/16 in. (14 mm) screws
• M3 × 9/16 in. (14 mm) screws
• 12-24 × 1/2 in. (12.7 mm) screws
• fan unit (BFAN-X)
• 10 AWG power lug
• general facilities card, if replacing (NGFC-G)
• cables:
• 50-pin micro DSUB connector
• DB-9 connector
• RJ-45 connector
• 6-pin wire-wrap right angle header connector
• 120-pin FCI power blade connector
17.2.3 Recommended tools
The following tools are recommended:
• screwdrivers
• protective gloves