January 2012 3.2 Environmental Conditions 161
3.2.7 CC 61xx, UV xxx, UM xxx, UE 2xx B(D) mounting position
When mounting, please observe proper minimum clearance, space require-
ments, length and position of the connecting cables.
Leave space for servicing and
connecting cables!
Leave space for air circulation and
servicing!
Leave space for servicing!
Leave space for air circulation!
Temperatures of > 150 °C are
possible with UE 21xB with
integral braking resistor; Do not
mount any temperature-sensitive
components!
Air out
Air in
PSL 130, UV(R), UE, UM, CC 61xx