January 2012 6.17 Monitoring Functions 993
Step Function Screen display
1 Start of the self test, immediately after 
compiling of the PLC program 
2 Phase 1 of the self-test:
Triggering and detection of essential 
internal signals are tested. In this phase of 
the self-test, the signals STO.A.G (X9/3a) 
and STOS.A.G (X9/2a) are set and deleted 
several times.
3 Waiting for machine control voltage RELAY EXT. DC 
VOLTAGE MISSING
4 Detection of the control voltage and cut-off 
of the STO.A.G/STOS.A.G signal by the NC 
software.
ES.A/ES.B must switch to zero within one 
second.
EMERGENCY STOP test
5 Switch-on of the STO.A.G/STOS.A.G signal 
by the NC software.
6 Phase 2 of the self-test:
Release and detection of the emergency 
stop signals ES.A and ES.B are tested 
internally. No hardware terminals are 
switched!
7 Normal control operation
Control voltage is on, STO.A.G/STOS.A.G 
output and ES.A/ES.B are at "1".
TRAVERSE REFERENCE 
POINTS