EasyManua.ls Logo

HEIDENHAIN MANUALPLUS 620 - Page 993

HEIDENHAIN MANUALPLUS 620
1818 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
January 2012 6.17 Monitoring Functions 993
Step Function Screen display
1 Start of the self test, immediately after
compiling of the PLC program
2 Phase 1 of the self-test:
Triggering and detection of essential
internal signals are tested. In this phase of
the self-test, the signals STO.A.G (X9/3a)
and STOS.A.G (X9/2a) are set and deleted
several times.
3 Waiting for machine control voltage RELAY EXT. DC
VOLTAGE MISSING
4 Detection of the control voltage and cut-off
of the STO.A.G/STOS.A.G signal by the NC
software.
ES.A/ES.B must switch to zero within one
second.
EMERGENCY STOP test
5 Switch-on of the STO.A.G/STOS.A.G signal
by the NC software.
6 Phase 2 of the self-test:
Release and detection of the emergency
stop signals ES.A and ES.B are tested
internally. No hardware terminals are
switched!
7 Normal control operation
Control voltage is on, STO.A.G/STOS.A.G
output and ES.A/ES.B are at "1".
TRAVERSE REFERENCE
POINTS

Table of Contents

Other manuals for HEIDENHAIN MANUALPLUS 620

Related product manuals