EasyManua.ls Logo

Juniper QFX Series - Chapter 5 Site Preparation; Planning a QFX3000-G Qfabric System Deployment

Juniper QFX Series
472 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 5
Site Preparation
•
Planning a QFX3000-G QFabric System Deployment on page 81
•
Site Preparation Checklist for a QFX3100 Director Device on page 83
•
Site Preparation Checklist for a QFX3008-I Interconnect Device on page 84
•
Site Preparation Checklist for a QFX3500 Device on page 86
•
General Site Guidelines on page 87
•
Site Electrical Wiring Guidelines on page 87
•
Environmental Requirements and Specifications for the QFX3100 Director
Device on page 89
•
Environmental Requirements and Specifications for a QFX3008-I Interconnect
Device on page 90
•
Environmental Requirements and Specifications for the QFX3500 Device on page 91
Planning a QFX3000-G QFabric System Deployment
A QFX3000 QFabric system is formed by interconnecting QFX3500 Node devices,
QFX3008-I Interconnect Devices, and QFX3100 Director devices. Two Virtual Chassis,
composed of four EX4200 switches each, are used to interconnect the control plane
and management network.
Before installing a QFabric system, you must consider the following factors:
•
The number of devices in the QFabric system and location—You can interconnect up
to 128 QFX3500 Node devices and 4 QFX3008-I Interconnect Devices; each QFabric
system must have 2 QFX3100 Director devices operating in a Director group. For
information about the size and strength of racks for the devices, see the following
topics:
•
Rack Requirements for a QFX3100 Director Device on page 93
•
Rack Requirements for a QFX3008-I Interconnect Device on page 95
•
Rack Requirements for a QFX3500 Device on page 96
•
Rack Requirements for EX4200 Switches
For the dimensions and weights of the devices, see the following topics:
81Copyright © 2012, Juniper Networks, Inc.

Table of Contents