SUBTASK 72-00-00-127-048-G00
(3) Have the grit blast operator do the steps that follow.
(a) Set the flow rate on the grit blast machine to use 25 pounds (11.3 kilograms) of coke in
one to one and a half minutes.
(b) Point the coke stream at the center of the engine fan blades (at the outer edge of the
spinner).
(c) Turn on the grit blast machine.
(d) Make sure that the coke cleaning kit, SPL-6362 is equally applied completely around the
spinner.
(e) Turn off the grit blast machine when the 25 pounds (11.3 kilograms) of coke have been
used.
SUBTASK 72-00-00-867-049-G00
(4) Continue to operate the engine for five minutes at approach idle power (to make sure all the
coke is removed from the engine).
SUBTASK 72-00-00-867-050-G00
(5) Use the Power Plant Operation (Normal) procedure to do the engine shut-down
(PAGEBLOCK 71-00-00/201).
SUBTASK 72-00-00-947-051-G00
CAUTION
MAKE SURE THAT YOU REMOVE THE BLOCKAGE MATERIAL AND THE
TAPE FROM THE FAN AIR SCOOP. DAMAGE TO THE AIRPLANE CAN
OCCUR IF THE BLOCKAGE IS NOT REMOVED.
(6) Remove the masking tape, G02350 [C10-012] and blockage material that are over the fan air
scoop.
SUBTASK 72-00-00-867-067-G00
(7) Open all the pneumatic bleed valves (PAGEBLOCK 36-11-00/501) that were closed for this
procedure.
SUBTASK 72-00-00-947-052-G00
(8) Cover the grit blast machine.
END OF TASK
767
AIRCRAFT MAINTENANCE MANUAL
CF6-80A SERIES ENGINES
72-00-00
NoC
Page 718
D633T1B7 Aug 22/2017
ECCN 9E991 BOEING PROPRIETARY - Copyright © Unpublished Work - See title page for details
EFFECTIVITY
ABX 001-007, 011, 012, 016-019, 021, 022, 025, 101,
109, 114, 115, 314-999

Table of Contents

Related product manuals