TASK 72-31-00-402-005-G00
3. Install the No. 1 Bearing Manifold
A. Consumable Materials
Reference Description Specification
D00552 [C02-019] Oil - Engine Lubricating (Refer to the model
specific GE Service Bulletin 79-0001 for CF6,
GEnx, GE90, or GE9X engines)
D50067 [C02-001] Compound - Anti-seize AMS 2518
B. Location Zones
Zone Area
412 Left Powerplant Nose Cowl
422 Right Powerplant Nose Cowl
C. Procedure
(Figure 201)
SUBTASK 72-31-00-642-026-G00
(1) Coat the threads and washer faces of bolts with anti-seize compound, D50067 [C02-001].
SUBTASK 72-31-00-642-027-G00
(2) Lightly coat preformed packings with oil, D00552 [C02-019].
ABX 001-007, 011, 012, 016-019, 021, 022, 025, 101, 109, 114, 115
SUBTASK 72-31-00-432-024-G00
(3) Place the gasket on the aft side of the flange of the No. 1 bearing manifold.
ABX 001-007, 011, 012, 016-019, 021, 022, 025, 101, 109, 114, 115, 314-999
SUBTASK 72-31-00-422-028-G00
(4) Install preformed packing J221P172 to the aft ring groove and preformed packing
9607M05P36 to the forward ring groove.
SUBTASK 72-31-00-642-029-G00
(5) Insert manifold assembly to the inside diameter of the fan rotor.
NOTE: To help with the installation of the No. 1 bearing manifold, the operator can do this step
that follows. Lightly coat the sealing surface of the fan rotor inner diameter with oil.
SUBTASK 72-31-00-422-030-G00
(6) Install the bolts and attach manifold to the inboard flange of the forward fan shaft.
(a) Tighten the ten bolts to 24-27 pound-inches (2.7-3.10 Newton meters).
END OF TASK
TASK 72-31-00-202-011-G00
4. Examine the No. 1 Bearing Manifold
A. References
Reference Title
70-11-06 P/B 201 FLUORESCENT PENETRANT INSPECTION - MAINTENANCE
PRACTICES
767
AIRCRAFT MAINTENANCE MANUAL
CF6-80A SERIES ENGINES
72-31-00
NoC
Page 203
D633T1B7 Dec 22/2018
ECCN 9E991 BOEING PROPRIETARY - Copyright © Unpublished Work - See title page for details
EFFECTIVITY
ABX 001-007, 011, 012, 016-019, 021, 022, 025, 101,
109, 114, 115, 314-999