4. Connect the QFX3008-I Interconnect device to each QFX3500 Node device for data
plane interconnection. See “Connecting a QFX3500 Node Device to a QFX3008-I
Interconnect Device” on page 284.
5. Verify that the QFX3008-I Interconnect device has been added to the QFX3000-G
QFabric system using the show fabric administration inventory operational-mode CLI
command.
Related
Documentation
Example: Configuring the Virtual Chassis for the QFabric Switch Control Plane•
• Removing a QFX3008-I Interconnect Device from a Rack or Cabinet on page 300
305Copyright © 2012, Juniper Networks, Inc.
Chapter 24: Removing or Replacing a Device