INSTALLATION
Sysmex SF-3000 Operator's Manual -- Revised September 1995 B-23
8.3 Reagent Container Preparation
Follow the procedure below to install the Cubitainer Spout Kit and Dispenser Kit to the
reagent containers. Refer to this table for the abbreviated names and brand names of
reagents, and connection methods.
Table B-1: Reagents, Color marker and Connection Method
Abbreviation Brand Name Volume Connection Method
PK CELLPACK 20 L Cubitainer Spout Kit No. 1
FBA STROMATOLYSER-FB 5 L Cubitainer Spout Kit CS-61
FDO STROMATOLYSER-FD (I) 5 L Cubitainer Spout Kit CS-61
FDT STROMATOLYSER-FD (II) 500 mL Dispenser Kit No. 1
SLS SULFOLYSER 500 mL Dispenser Kit No. 1
1. Dispenser Kit No. 1
(1) Detach the labels SLS and FDT from
the provided Indication Mark No.
908 (shown in Figure B-32).
SLS
FBA
FDT
FDO
Figure B-32: Indication Mark No. 908
(2) Attach them on the cap of the
Dispenser Kit No. 1 as shown in
Figure B-33. These labels will help
identify the proper tube connection
when the reagent is replaced.
• Attach the Indication Mark "FDT" to
the cap of the Dispenser Kit No. 1
for STROMATOLYSER-FD (II).
• Attach the Indication Mark "SLS" to
the cap of the Dispenser Kit No. 1
for SULFOLYSER.
Attach the Indication
Mark No. 908
Dispenser Kit No. 1
Figure B-33: Attach the Label