INSTALLATION, Reagent Container Preparation
Sysmex SF-3000 Operator's Manual -- Revised September 1995 B-25
3. Assemble Cubitainer Spout Kit CS-61
(1) Detach the labels FBA and FDO
from the provided Indication Mark
No. 908 (shown in Figure B-35).
(2) Attach them on the connector of each
Cubitainer Spout Kit. These labels
will help identify the proper tube
connection when the reagent is
replaced.
SLS
FBA
FDT
FDO
Figure B-35: Indication Mark No. 908
• Attach the Indication Mark "FBA"
to the cap of the Spout Kit for STROMATOLYSER-FB.
• Attach the Indication Mark "FDO" to the cap of the Spout Kit for
STROMATOLYSER-FD (I).
CAUTION: Do not cover the hole on the Spout Kit cap with the label.
(3) Cut the silicone tube provided in the
kit so that there will be a 2.5 cm
clearance between the tube end and
the bottom of the container.
(4) Assemble the parts of the
Cubitainer Spout Kit.
(5) Rinse the assembled silicone tube
and weight in the reagent with
which they will be used. This is to
prevent the tube and weight from
contaminating the reagent cube.
(6) Insert the Cubitainer Spout Kit into
the container and screw down the
cap. Keep the container cap in a
safe place for future reuse.
Container Lid
Connector
Silicone Tube
Weight
Figure B-36: Assemble Cubitainer Spout
Kit CS-61