EasyManua.ls Logo

Tecnam P2002 JF - Propeller Installation

Tecnam P2002 JF
1289 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 203 2
nd
Edition Rev 0
61-10
PROPELLER MAINTENACE PRACTICES
2. PROPELLER INSTALLATION
Procedure
Step
no.
Propeller installation
Task description
Additional info &
References
1.
Make sure Master Switch is turned
OFF.
2.
Parking brake: engage
3.
Engine starter circuit breaker: pull out
4.
Make sure that the propeller and engine
mounting flange mating faces are clean
and undamaged.
Clean engine and
propeller flange with
solvent of gasoline. Both
surfaces must be dry and
clean. Remove all surface
defects.
Remove the shipping
plugs and protective
wrap, if any.
5.
Check bolts for cracks, rust, propeller
thread and cleanliness
6.
Check spinner bulkhead for craks or
deformations
7.
Install spinner spacer and propeller
Refer to Figure 4.
8.
Insert washers and fasten locknuts
Bolt torque is
17NM
9.
Safety all bolts
10.
Install spinner
NOTE
After correct installation of propeller and before takeoff, let the engine
run for few minutes and, after turning it off, carry out further inspection
(tightness, overall state, etc.).

Table of Contents

Other manuals for Tecnam P2002 JF

Related product manuals