EasyManua.ls Logo

Tecnam P2002 JF - Operation in Highly Dusty or Industrial Pollution Environment; Special Scheduled Maintenance

Tecnam P2002 JF
1289 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
nd
Edition - Rev 0
Page 1
05-50
SPECIAL SCHEDULED MAINTENANCE
05-50 SPECIAL SCHEDULED MAINTENANCE
In addition to those listed on Section 05.20, following inspections are required at speci-
fied time intervals as consequence of the particular environment which the aircraft is
operated in. Unless otherwise indicated, these inspections are to be repeated at each oc-
currence of the specified interval.
A log book entry should be made upon completion of any inspec-
tions
1. Operation in Highly Dusty or Industrial Pollution Environ-
ment
ITEM
INSPECTION
INSPECTION
INTERVAL
Engine air filter
Clean and inspect.
Daily
Engine oil cooler and coolant
radiator
Clean and inspect.
25 hours
Pitot/Static system
Check for obstruction.
100 hours or as required
NLG shock absorbers
Clean.
Before each flight
Landing gear wheel bearings
Clean, inspect and repack.
50 hours
Windows
Inspect for cracks, erosion, crazing,
visibility and cleanliness.
Daily
Structure drain holes
Clean with pipe cleaner
Before each flight

Table of Contents

Other manuals for Tecnam P2002 JF

Related product manuals