EasyManua.ls Logo

Tecnam P2002 JF - Scheduled Maintenance

Tecnam P2002 JF
1289 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
nd
Edition - Rev 0
Page 5
05-20
INSPECTION PROGRAM
4. Scheduled maintenance
ATA
Item
Maintenance task
FREQUENCY
A
B
C
D
E
05
Lubrication
points
Perform lubrication tasks: refer to
Chapter 05-30 for Lubrication Charts
and related frequencies.
X
06
Inspection caps
Before installing the caps removed
for maintenance purposes, inspect for
absence of loose tools, especially in
correspondence of the flight controls.
Then make sure all inspection caps
are installed and secured.
06
Engine Cowling
Remove cowlings and check them for
condition. Check fasteners and hinges
for condition.
X
06
Engine Cowling
Check the integrity of ablative cowl-
ing coating (internal side of engine
cowlings). Repaint if necessary.
X
11
Markings and
Placards
Inspect internal placards, check for
their readability and wear.
X
11
Markings and
Placards
Inspect external placards and ID
board: check for readability and wear
X
21
Heating and
ventilation
Cabin heat valve: check for cracks
and security of installation.
X
21
Heating and
ventilation
Control the Cabin Heat valve return
spring.
X
21
Heating and
ventilation
Perform a cabin heat valve control
cable rigging.
X
21
Heating and
ventilation
Control the hoses condition of Heat-
ing system. No damage is allowed.
Control fasteners.
X
21
Heating and
ventilation
Control cabin heat control knob and
carburetor heat control knob for con-
dition.
X

Table of Contents

Other manuals for Tecnam P2002 JF

Related product manuals