This AMM Supplement describes the complete procedure regarding the P2002 JF struc-
ture reassembling, when the parts are shipment from the factory.
In particular this supplement describe the procedure for the installation of seats, battery,
wings and stabilator and rudder trim
In this document is described also the connection and check of control cables, the fas-
tening of the heating hoses and static port hoses after the installation of wings.
Moreover there are some part in the supplements for engine check and the instruction
for the installation and fastening of electrical wire in the wing compartment.
Herein are reported the ATA Chapters impacted by procedure in subject.
For the correct reassembly the suggested installation sequence is the following:
1. The wing-fuselage coupling (refer to chapter 57 in this document)
2. Flaps and Ailerons control assembly (refer to chapter 57 in this document)
3. Control cable and hoses installation (refer to chapter 57 in this document)
4. Stabilator (refer to chapter 55 in this document)
5. Battery (refer to chapter 12 in this document)
6. Seats (refer to chapter 12 in this document)
7. Power plant Post-shipment checks (refer to chapter 72 in this document)