EasyManua.ls Logo

Tecnam P2002 JF - Page 881

Tecnam P2002 JF
1289 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
79-10
OIL SYSTEM MAINTENANCE AND PRACTICES
2
nd
Edition - Rev 0
Page 204
Step
no.
Task description
Additional info &
References
6.
Clear the oil cooler of support; replace it if needed.
Hold firmly the cooler by
hand during removal.
7.
Place into position the new/overhauled unit
Align cooler’s holes with
support’s ones.
Ref.: Figure 8
8.
Place into position hoses and screw them and cool-
er to support
Hold firmly the cooler by
hand during installation.
Restore connections re-
moved at step 5.
9.
Install engine cowlings

Table of Contents

Other manuals for Tecnam P2002 JF

Related product manuals