SUPPLEMENT S1
Chapter 5 – Inspection Program
CHAPTER 5 – INSPECTION PROGRAM
Table herein reported shows the additional maintenance tasks performed at de-
fined intervals, which must be added to basic maintenance program, to retain the
variable pitch propeller system in a serviceable condition.
Refer to following documents for the additional maintenance information:
For the Rotax 912S3 engine, unless otherwise stated in the present Manual, it is
compulsory to adhere to maintenance requirements as reported in the Mainte-
nance Manual (Line Maintenance) (p/n 899373 ed.1 rev.0 of 9/1/2007 and later
versions) furnished along with the present manual.
For the Hoffmann propeller, please refer to its Operation and maintenance n°
E5400A.
For the Governor produced by Jihostroja.s., please refer to its Operation and in-
stallation manual (p/n P-ROV-514/01).
Airframe and systems inspection schedule refer to basic Aircraft Maintenance
Manual and table below: