EasyManua.ls Logo

TeeJet 5000 - Seed Drill Operation (Other Type)

Default Icon
370 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TEEJET 5000 OPERATORS MANUAL SEED DRILL, OTHER TYPE
5.3
SEED DRILL OPERATION (OTHER TYPE)
Move between the two pages
by pressing “NEXT PAGE”.
KG: The amount sown in KG, measured by a sensor fitted on the drill
shaft. Calibrating the system is necessary to ensure correct
operation and this is done under “ENCODE”.
KG LEFT: The amount in KG of seed left in the hopper (the amount filled in
must be encoded before work commences).
KG/HA: Seed rate in KG/HA.
RPM: RPM of an axle when this has been selected.
TRACK+1: Moves one step forward in the tramline rhythm.
TRACK-1: Moves one step backwards in the tramline rhythm.
HOLD KEY
Press if the present bout is not required in the selected
rhythm. This function “holds” the present status
regardless of how many times the drill is raised. When
this function is activated, “HOLD” flashes on the
display.
TRAMLINE INDICATOR
No tramlines are made.
Tramlines are made.

Table of Contents