Remove the door from the NCS 2006 shelf and reinstall it after installing all the other modules.Note
Figure 103: Handling the Chassis During Installation
Procedure
Step 1
Complete the necessary task as applicable:
•
DLP-L1 Verify the NCS 2006 Shelf for AC Power Module Installation, on page 167
•
DLP-L2 Verify the NCS 2006 Shelf for DC Power Module Installation, on page 168
Step 2
Complete the necessary task as applicable:
•
DLP-L3 Mounting the Reversible Brackets on the NCS 2006 Shelf for ANSI Rack Configuration, on
page 169
•
DLP-L4 Mounting the Bracket with Air Deflectors (Front-to-Back) on the NCS 2006 Shelf for ANSI
Rack Configuration, on page 171
Stop. You have completed this procedure.
Cisco NCS 2000 Series Hardware Installation Guide
166
Mounting the Brackets on NCS 2006 Shelf
NTP-L2 Mounting the Brackets in ANSI Configuration