CHAPTER 6
Mounting the Cisco NCS 2002 Shelf 61
ANSI Rack Installation 61
Mounting a Single Node 62
ETSI Rack Installation 62
Mounting a Single Node 64
Wall Mounting the NCS 2002 Shelf 65
NTP-L42 Installing the NCS 2002 Shelf 65
DLP-L42 Mounting the NCS 2002 Shelf on a Rack (One Person) 67
DLP-L43 Mounting the NCS 2002 Shelf on the Wall 69
DLP-L44 Mounting the NCS 2002 Shelf on the Desktop 72
CHAPTER 7
Connecting Power and Ground 75
Power and Ground Description 75
ANSI Power and Ground 75
ETSI Power and Ground 76
NTP-L35 Installing the Power and Ground to the NCS 2002 Shelf 76
DLP-L49 Connecting Office Power (AC) to the NCS 2002 Shelf 80
DLP-L50 Connecting Office Power (DC) to the NCS 2002 Shelf (ANSI Only) 83
DLP-L51 Connecting Office Power (DC) to the NCS 2002 Shelf (ETSI Only) 88
DLP-L52 Turning On and Verifying AC Office Power on the NCS 2002 Shelf 91
DLP-L53 Turning On and Verifying DC Office Power on the NCS2002Shelf 92
CHAPTER 8
Connecting and Routing the Cables and Wires 95
NTP-L36 Attaching Wires to Timing, LAN, and Craft Pin Connections in NCS 2002 95
DLP-L54 Installing Timing Wires in Cisco NCS 2002 - ANSI 96
DLP-L55 Installing Timing Wires in Cisco NCS 2002- ETSI 98
DLP-L56 Installing LAN Wires in Cisco NCS 2002 102
CHAPTER 9
Cisco NCS 2002 Shelf Installation Acceptance Test 103
NTP-L38 Performing the NCS 2002 Shelf Installation Acceptance Test 103
DLP-L60 Inspecting the NCS 2002 Shelf Installation and Connections 104
DLP-L61 Measuring DC Voltage on the NCS 2002 Shelf 105
CHAPTER 10
Installing the Cisco NCS 2002 Door and Other Modules 107
Cisco NCS 2000 Series Hardware Installation Guide
v
Contents