EasyManua.ls Logo

Leibinger JET2neo - Starting; Remove Transportation Safety Devices

Leibinger JET2neo
294 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 36 Transport/Start up Group 5
Release R1.12 en JET2 neo
Installation of print head
During an installation of a device in a production line, the operating staff
should be not endangered. Due to moving products under the print head
danger of bruising and shearing can be caused. The regulations of the
machinery directives should be observed!
5.4 Starting
(Commissioning)
For a safe transport some hydraulic components are supplied with transportation protection
(cable ties) and the reservoir tanks are evacuated. The following steps have to be carried out
before the initial operation
Remove the transportation protection (cable ties) (Step 1)
Fill the reservoir tank (Step 2)
Carry out the function <Fill up routine> (Step 3).
5.4.1 Remove transportation safety devices
(Step 1)
The pumps of the hydraulic system are secured with cable ties. These have to be
absolutely removed.
Proceeding:
Dismantle the back cover of the hydraulic cabinet (1) by loosing the fixing screws (2).
Attention!
The cable tie at the main filter (3) should not be removed!
Remove the transportation protection (cable ties).
Now attach the back cover of the hydraulic cabinet again with the according fixing
screws.

Table of Contents

Other manuals for Leibinger JET2neo

Related product manuals